人妻无码精品一区二区三区蜜臀,成人影片5x57.Cn免费的,人妻97,黄片免费高潮

冷再生施工和機(jī)械租賃業(yè)務(wù)
筑路架橋,奉獻(xiàn)社會(huì);以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心強(qiáng)夯機(jī)設(shè)備施工過程中應(yīng)有人專門負(fù)責(zé)監(jiān)測(cè)工作

強(qiáng)夯機(jī)設(shè)備施工過程中應(yīng)有人專門負(fù)責(zé)監(jiān)測(cè)工作

來源:http://m.ebagshop.com.cn/ 日期:2022-06-27 發(fā)布人:
(1)開夯前應(yīng)檢查夯錘重和落距,以確保單擊能量符合設(shè)計(jì)要求。
(1) Before tamping, the weight and falling distance of the rammer shall be checked to ensure that the click energy meets the design requirements.
(2)每遍夯擊前,應(yīng)對(duì)夯點(diǎn)放線進(jìn)行復(fù)核,夯完后檢查夯坑位置,發(fā)現(xiàn)偏差及時(shí)糾正。
(2) Before each tamping, the setting out of tamping points shall be rechecked. After tamping, the position of tamping pit shall be checked, and any deviation found shall be corrected in time.
(3)按要求檢查每個(gè)夯點(diǎn)的夯擊次數(shù)和每次的夯沉量。
(3) Check the tamping times and tamping settlement of each tamping point as required.
(4)在夯擊中,當(dāng)發(fā)現(xiàn)地質(zhì)條件與設(shè)計(jì)提供的數(shù)據(jù)不符時(shí)應(yīng)及時(shí)會(huì)同有關(guān)部門研究處理。
(4) When the geological conditions are found to be inconsistent with the data provided by the design during compaction, it shall be timely studied and handled with relevant departments.
(5)施工中對(duì)方案制定的工作量或要求進(jìn)行改變時(shí),應(yīng)報(bào)上級(jí)主管技術(shù)部門批準(zhǔn)后方可施工。
(5) In case of any change to the workload or requirements formulated in the scheme during construction, it shall be reported to the superior competent technical department for approval before construction.
(6)強(qiáng)夯施工中應(yīng)在現(xiàn)場(chǎng)及時(shí)對(duì)各項(xiàng)參數(shù)及施工情況進(jìn)行詳細(xì)記錄。
(6) During dynamic compaction construction, various parameters and construction conditions shall be recorded in detail on site.
(7)強(qiáng)夯過程中夯坑周圍不應(yīng)有過大的隆起,如有異常及時(shí)報(bào)告監(jiān)理工程師,會(huì)同設(shè)計(jì)、業(yè)主等部門再作處理辦法。
(7) During dynamic compaction, there shall be no excessive uplift around the tamping pit. If there is any abnormality, it shall be reported to the supervising engineer in time, and the handling method shall be made together with the design department, the owner and other departments.
冷再生機(jī)租賃
(8)夯坑應(yīng)當(dāng)日施工,當(dāng)日推平,以防下雨泡水。
(8) The tamping pit shall be constructed and leveled on the same day to prevent rain and water.
(9)竣工驗(yàn)收后的強(qiáng)夯場(chǎng)地應(yīng)及時(shí)投入使用,不應(yīng)久置。
(9) The dynamic compaction site after completion acceptance shall be put into use in time and shall not be left for a long time.
(10)強(qiáng)夯竣工面應(yīng)防止重型車輛碾壓。
(10) The finished surface of dynamic compaction shall be prevented from being rolled by heavy vehicles.
冷再生機(jī)租賃廠家認(rèn)為該設(shè)備的強(qiáng)夯法不僅能提高地基土的強(qiáng)度,降低其壓縮性,還能改善抗振動(dòng)液化的能力和土的濕陷性,因此它不僅適用于處理碎石土、砂土、粉土、黏性土、雜填土和素填土地基,還常用于處理可液化砂土地基和濕陷性黃土地基。
The leasing manufacturer of the cold recycling machine believes that the dynamic compaction method of the equipment can not only improve the strength of the foundation soil, reduce its compressibility, but also improve the anti vibration liquefaction ability and eliminate the collapsibility of the soil. Therefore, it is not only applicable to the treatment of gravel soil, sandy soil, silty soil, cohesive soil, miscellaneous fill and plain fill foundation, but also often used to treat liquefiable sand soil foundation and collapsible loess foundation.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對(duì)這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://m.ebagshop.com.cn并咨詢我們的工作人員,將竭誠(chéng)為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://m.ebagshop.com.cn And consult our staff, will serve you wholeheartedly.

閱讀/ Recommended reading

在現(xiàn)代交通網(wǎng)絡(luò)持續(xù)發(fā)展的進(jìn)程中,道路養(yǎng)護(hù)成為保障交通順暢的關(guān)鍵環(huán)節(jié)。冷再生機(jī)作為道路養(yǎng)護(hù)領(lǐng)域的重要設(shè)備,憑借其獨(dú)特的技術(shù)和顯著優(yōu)勢(shì),為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設(shè)...

冷再生機(jī)租賃:改良土?xí)玫侥男┰O(shè)備? 2025-04-18
租賃冷再生機(jī)有什么優(yōu)勢(shì) 2025-04-15
冷再生機(jī)租賃燃油費(fèi)和操作手費(fèi)用誰承擔(dān)? 2025-04-14
冷再生機(jī)租賃:粉料撒布車工作原理及優(yōu)勢(shì) 2025-04-12

產(chǎn)品/ Recommended products