人妻无码精品一区二区三区蜜臀,成人影片5x57.Cn免费的,人妻97,黄片免费高潮

冷再生施工和機(jī)械租賃業(yè)務(wù)
筑路架橋,奉獻(xiàn)社會;以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心冷再生機(jī)工程的施工要做好準(zhǔn)備工作

冷再生機(jī)工程的施工要做好準(zhǔn)備工作

來源:http://m.ebagshop.com.cn/ 日期:2022-09-13 發(fā)布人:
冷再生機(jī)租賃廠家在道路施工前要做好充分的準(zhǔn)備工作,才能保障整個施工過程的順利進(jìn)行,需要做好哪些準(zhǔn)備工作呢?
The leasing manufacturer of cold recycling machine should make full preparations before road construction to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立嚴(yán)謹(jǐn)、規(guī)范的內(nèi)部約束、考核、激勵機(jī)制,用制度管人,用規(guī)章管理工程。
1. We should establish strict and standardized internal restraint, assessment and incentive mechanisms, manage people with systems and manage projects with rules.
2、要補(bǔ)充調(diào)查工程沿線影響施工的因素,標(biāo)注出平面位置圖,并進(jìn)行、論證,寫出調(diào)查報告,作為修訂施工方案、編制施工控制預(yù)算的依據(jù)。
2. The factors affecting the construction along the line of the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated to serve as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設(shè)計意圖,澄清圖紙中的問題,恢復(fù)定線和施工放樣。對所有控制點進(jìn)行加密、保護(hù)、記錄。
3. Construction drawings, thoroughly understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據(jù)施工合同協(xié)議和現(xiàn)場調(diào)研認(rèn)真編制施工控制預(yù)算,作為控制支出、進(jìn)行成本預(yù)測分析、經(jīng)濟(jì)核算以及統(tǒng)計工程進(jìn)度的依據(jù)。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and on-site investigation as the basis for expenditure control, cost prediction and analysis, economic accounting and project progress statistics.
5、進(jìn)行業(yè)務(wù)、技術(shù)培訓(xùn)和技術(shù)交底,使相關(guān)人員對工程的技術(shù)標(biāo)準(zhǔn)、操作規(guī)程、質(zhì)量控制、資料整理有多方面的了解。
5. Conduct business, technical training and technical disclosure to enable relevant personnel to understand the technical standards, operating procedures, quality control and data collation of the project in many aspects.
冷再生機(jī)租賃
6、建立工地試驗室,并申請臨時資質(zhì)。對施工中擬使用的各種原材料取樣試驗,建立相關(guān)技術(shù)參數(shù)的數(shù)據(jù)庫。
6. Establish site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7、繪制關(guān)鍵工序施工工藝流程圖和試驗操作規(guī)程、質(zhì)量檢查評定、計量支付、設(shè)計變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根據(jù)工期要求、技術(shù)標(biāo)準(zhǔn)、機(jī)械設(shè)備能力、材料供應(yīng)、自然條件等進(jìn)行綜合分析,選擇佳施工方案,完善施工組織設(shè)計。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., comprehensive analysis shall be conducted to select the best construction scheme and improve the construction organization design.
冷再生機(jī)工程的施工要做好準(zhǔn)備工作才行,這樣才能更好的讓工程項目的率的完成,更多相關(guān)內(nèi)容就來我們網(wǎng)站http://m.ebagshop.com.cn咨詢吧!
The construction of the cold recycling machine project should be well prepared, so as to better ensure the safe and efficient completion of the project. Please come to our website for more relevant content http://m.ebagshop.com.cn Consult!

閱讀/ Recommended reading

在現(xiàn)代交通網(wǎng)絡(luò)持續(xù)發(fā)展的進(jìn)程中,道路養(yǎng)護(hù)成為保障交通順暢的關(guān)鍵環(huán)節(jié)。冷再生機(jī)作為道路養(yǎng)護(hù)領(lǐng)域的重要設(shè)備,憑借其獨(dú)特的技術(shù)和顯著優(yōu)勢,為道路的可持續(xù)發(fā)展提供了有力支持,成為道路建設(shè)...

冷再生機(jī)租賃:改良土?xí)玫侥男┰O(shè)備? 2025-04-18
租賃冷再生機(jī)有什么優(yōu)勢 2025-04-15
冷再生機(jī)租賃燃油費(fèi)和操作手費(fèi)用誰承擔(dān)? 2025-04-14
冷再生機(jī)租賃:粉料撒布車工作原理及優(yōu)勢 2025-04-12

產(chǎn)品/ Recommended products