冷再生機磨合期的使用注意事項
來源:http://m.ebagshop.com.cn/ 日期:2023-03-15 發(fā)布人:
冷再生機是一種利用壓實各種建筑和筑路材料的工程設(shè)備,因為可以用于壓實各種非粘性土壤、碎石、碎石混合料以及各種瀝青混凝土而被廣泛應用。那么該設(shè)備在磨合期都需要注意哪些問題呢?下面冷再生機租賃人員為您講解:
The cold recycling machine is a kind of engineering equipment that uses to compact various building and road materials. It is widely used because it can be used to compact various non-cohesive soil, crushed stone, crushed stone mixture and various asphalt concrete. What problems should be paid attention to during the running-in period of the equipment? The following personnel will explain to you:
1、注意經(jīng)常察看各儀表是否異常,如果發(fā)現(xiàn)異常應及時停下設(shè)備進行處理,在原因未找到、故障未前,不可以運行設(shè)備。
1. Pay attention to frequently check whether each instrument is abnormal. If any abnormality is found, stop the equipment in time to deal with it. Do not operate the equipment until the cause is found and the fault is eliminated.
2、堅持清理機器并及時調(diào)整、緊固松動的零部件,以防因松動而加劇零部件的磨損或?qū)е铝悴考笔А?/div>
2. Adhere to cleaning the machine and timely adjust and tighten the loose parts to prevent the wear of parts or the loss of parts due to the looseness.
3、注意冷再生機磨合期的工作負荷,磨合期內(nèi)的工作負荷一般不能超過額定工作負荷的80%,并要安排合適的工作量,防止設(shè)備因為長時間持續(xù)作業(yè)而出現(xiàn)過熱。
3. Pay attention to the working load during the running-in period of the cold regenerator. The working load during the running-in period shall not exceed 80% of the rated working load, and appropriate workload shall be arranged to prevent the equipment from overheating due to long-term continuous operation.


4、磨合期停止,應對設(shè)備進行一次保養(yǎng),同時注意油液的更換。
4. When the running-in period is stopped, the equipment should be maintained once and the oil should be replaced.
5、注意經(jīng)常檢查潤滑油、液壓油、冷卻液、制動液以及燃油(水)位,并注意做好整機密封性的檢查,檢查中如果發(fā)現(xiàn)油水缺乏過多,應查明原因,同時,應做好各潤滑點的潤滑強化,建議在磨合期內(nèi),每次使用前都要進行潤滑油的檢查與添加。
5. Pay attention to check the lubricating oil, hydraulic oil, cooling fluid, brake fluid and fuel (water) level frequently, and pay attention to check the sealing of the whole machine. If there is too much oil and water in the inspection, find out the reason. At the same time, strengthen the lubrication of each lubricating point. It is recommended to check and add the lubricating oil before each use during the running-in period.
冷再生機在磨合期內(nèi)使用保養(yǎng)的要求可歸納為:減輕負荷、注意檢查、強化潤滑。只要做到上述幾點,就可以減少早期故障的發(fā)生,提高運行的與穩(wěn)定性,延長設(shè)備的使用壽命。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://m.ebagshop.com.cn咨詢吧!
The requirements for the use and maintenance of the cold regenerator during the running-in period can be summarized as follows: reduce the load, pay attention to inspection and strengthen lubrication. As long as the above points are achieved, the occurrence of early failures can be reduced, the safety and stability of operation can be improved, and the service life of the equipment can be extended. Come to our website for more relevant content http://m.ebagshop.com.cn Ask!
下一篇:冷再生機打滑的原因和解決辦法 上一篇:推土機作業(yè)應注意幾個要點
閱讀/ Recommended reading
- 冷再生機租賃燃油費和操作手費用誰承擔? 2025-04-14
- 冷再生機租賃:粉料撒布車工作原理及優(yōu)勢 2025-04-12
- 抉擇冷再生機租賃服務的關(guān)鍵考量因素? 2025-04-11
- 為什么會選擇公司租冷再生機呢? 2025-04-10
冷再生機租賃:改良土會用到哪些設(shè)備?
[2018-08-23]
改良土用到哪些設(shè)備?What equipment is used for soil improvement?一、破碎篩分設(shè)備1、 Crushing and screening e...