在排除電氣故障后,檢查振動馬達與振動軸的彈性聯(lián)軸器和振動軸內(nèi)潤滑油的情況。潤滑油過多會使振頻上不去,一般是因馬達組合油封損壞向軸內(nèi)漏油所致。如果冷再生租賃機振動軸花鍵套磨損嚴重,也會導(dǎo)致失振故障,此時應(yīng)對補油壓力、系統(tǒng)工作壓力進行檢測,從而做出診斷。
After eliminating electrical faults, check the elastic coupling between the vibration motor and the vibration shaft, as well as the lubrication oil inside the vibration shaft. Excessive lubricating oil can prevent the vibration frequency from rising, usually due to damage to the motor combination oil seal and oil leakage into the shaft. If the vibration shaft spline sleeve of the cold regeneration leasing machine is severely worn, it can also lead to vibration failure. At this time, the oil replenishment pressure and system working pressure should be tested to make a diagnosis.
檢查油泵泄漏量、機械摩擦力大小、傳輸管道的泄漏和堵塞,調(diào)節(jié)閥的調(diào)定壓力和流量正確與否,查明后,應(yīng)對癥排除。
Check the leakage rate of the oil pump, the size of mechanical friction force, the leakage and blockage of the transmission pipeline, and whether the set pressure and flow rate of the regulating valve are correct. After investigation, eliminate the symptoms.
另外,再檢查振動壓路機液壓馬達的容積效率,機械摩擦阻力和背壓力。
In addition, check the volumetric efficiency, mechanical friction resistance, and back pressure of the hydraulic motor of the vibratory roller again.


如果液壓馬達因磨損或密封件密封不良而泄漏量增加,或機械摩擦阻力過大,則多是液壓馬達轉(zhuǎn)速低、轉(zhuǎn)矩小的原因所在,應(yīng)進而查明并對癥排除。
If the leakage rate of the hydraulic motor increases due to wear or poor sealing of the sealing components, or if the mechanical friction resistance is too high, it is mostly due to the low speed and low torque of the hydraulic motor, which should be further identified and eliminated accordingly.
由于冷再生租賃機機器的前后振動系統(tǒng)既獨立又相互聯(lián)系(共用補油泵),所以可應(yīng)用“元件置換法”進行診斷。比如,有一輪振頻低時,可將前、后兩馬達的管路互換,若故障已轉(zhuǎn)移,則表明故障是在泵上,否則是馬達有故障。同樣,對用于變頻操作的排量控制閥也可采用同樣的“互換法”作診斷。
Due to the fact that the front and rear vibration systems of the cold regeneration leasing machine are both independent and interconnected (sharing a makeup oil pump), the "component replacement method" can be applied for diagnosis. For example, when there is a low vibration frequency in one round, the pipelines of the front and rear motors can be interchanged. If the fault has shifted, it indicates that the fault is on the pump, otherwise it is a motor fault. Similarly, the same "exchange method" can be used for diagnosis of displacement control valves used for variable frequency operation.
振動壓路機主油路的啟振初始壓力可達32MPa,其連續(xù)工作壓力大振輻時可達20MPa,小振幅時約為12MPa。當發(fā)動機在額定轉(zhuǎn)速下其連續(xù)工作壓力大大高于標準值時,則應(yīng)檢查振動軸的轉(zhuǎn)動靈活性,即用專用工具旋轉(zhuǎn)振動軸,使偏心塊處在高位后再釋放,此時振動軸應(yīng)能擺動幾次,若感覺阻力大,則應(yīng)更換振動軸軸承。
The initial pressure of the main oil circuit of the vibration roller can reach 32MPa, and its continuous working pressure can reach 20MPa at high vibration amplitude and about 12MPa at small amplitude. When the continuous working pressure of the engine at rated speed is significantly higher than the standard value, the rotational flexibility of the vibration shaft should be checked. That is, use a special tool to rotate the vibration shaft, make the eccentric block at a high position, and then release it. At this time, the vibration shaft should be able to swing several times. If resistance is felt, the vibration shaft bearing should be replaced.
感謝您的閱讀,此文的文章來源:冷再生機租賃更多的內(nèi)容和問題請點 http://m.ebagshop.com.cn我們會繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is: Cold Recycling Machine Rental. For more information and questions, please click http://m.ebagshop.com.cn We will continue to work hard to provide you with services. Thank you for your support!
下一篇:對冷再生機維護要注意什么? 上一篇:水泥就地冷再生施工常見的問題及施工要點
閱讀/ Recommended reading
- 冷再生機租賃:粉料撒布車工作原理及優(yōu)勢 2025-04-12
- 抉擇冷再生機租賃服務(wù)的關(guān)鍵考量因素? 2025-04-11
- 為什么會選擇公司租冷再生機呢? 2025-04-10
- 冷再生機技術(shù)優(yōu)勢 2025-04-09
冷再生機租賃燃油費和操作手費用誰承擔?
[2018-08-23]
冷再生機租賃時燃油費和操作手費用的承擔方?jīng)]有固定標準,主要取決于租賃合同中的約定。以下是一些常見的情況:When leasing a cold regeneration mach...